Skip to content

Installation Services: Prewire Checklist – Louis Vuitton

"*" indicates required fields

Please fill out every field. If a field does not apply, insert a dash or type NA.
TCS requires a minimum of two weeks lead time for installation after all items below have been confirmed.
Site Address*
NOTE: All Site Address fields are required

Site Details

Do all thermostats and lighting-override locations have a 2″ x 4″ junction box installed with a 3/4″ pipe from each one, extended above the ceiling space with a pull string?*
Please provide a picture of completion below
Max. file size: 50 MB.
Are the 2″ x 4″ junction boxes for the thermostats installed horizontally and 9″ center to center?*
Max. file size: 50 MB.
Please provide a picture of completion below
Are the walls finished at all remote sensor locations?*
Are the conduit drops for RTUs installed?*
Will wire pulls be above open store(s), limiting access?*
By filling out and submitting this form, you acknowledge that you are responsible for this project and that all information in this document is complete and accurate.
Contact Us