Installation Services: General Contractor Checklist – Louis Vuitton

"*" indicates required fields

Please fill out every field. If a field does not apply, insert a dash or type NA.
TCS requires a minimum of two weeks lead time for installation after all items below have been confirmed.
MM slash DD slash YYYY
Site Address*
NOTE: All Site Address fields are required

Site Details

Does the site have permanent power?*
Are all HVAC units functional and operational with attached ductwork?*
Are the walls finished at all remote sensor locations?*
Is the millwork/trim where remote sensors are located installed?*
Has a wall outlet with 120VAC power been installed to power the QD2040 and Cellular Modem?*
Are access panels in place to access ceiling mounted AHUs?*
Have 120VAC lighting contactors been installed and wired to lighting circuits?*
MM slash DD slash YYYY
By filling out and submitting this form, you acknowledge that you are responsible for this project and that all information in this document is complete and accurate.