Installation Services: General Contractor Checklist

"*" indicates required fields

Please fill out every field. If a field does not apply, insert a dash or type NA.
TCS requires a minimum of two weeks lead time for installation after all items below have been confirmed.
MM slash DD slash YYYY
Site Address*
NOTE: All Site Address fields are required

Site Details

Does the site have permanent power?*
Are all HVAC units functional and operational with attached ductwork?*
Are the walls finished at all remote sensor locations?*
Do all thermostats, sensors, and override locations have 2″ x 4″ junction boxes installed with a 3/4″ pipe from each one extended above the ceiling space with a pull string?*
Are the 2″ x 4″ junction boxes for the thermostats in the Manager’s office installed horizontally and 9″ center to center?*
Are the 2″ x 4″ junction boxes for all remote room sensors installed vertically?*
Has a three-phase 15 Amp circuit been provided and installed for powering the energy meter?*
Has a wall outlet with 120VAC power been installed to power the QD2040 and Cellular Modem?*
If the manager’s office where the thermostats are located has a hard lid, was an access door installed?*
Have 120VAC lighting contactors been installed and wired to lighting circuits?*
MM slash DD slash YYYY
By filling out and submitting this form, you acknowledge that you are responsible for this project and that all information in this document is complete and accurate.